Wednesday, January 15, 2025

PLN to build three wind power plants by 2027, enhancing green energy commitment

Reading Time: < 1 minute
Julian Isaac

Journalist

Editor

Interview

PT Perusahaan Listrik Negara (PLN), Indonesia’s state-owned electricity company, has announced plans to construct three new wind power plants (PLTB) − PLTB Timor, PLTB Tanah Laut, and PLTB Sulbagsel − by 2027 with a combined capacity of 152 MW.

PLTB Timor, slated for operationalization in 2025, will generate 22 MW. Meanwhile, PLTB Tanah Laut aims for a capacity of 70 MW by 2025, and PLTB Sulbagsel will contribute 60 MW and 70 MW upon completion in 2027.

Addressing a hearing with the House of Representatives Commission VII, PLN’s CEO Darmawan Prasodjo emphasized the company’s commitment to bolstering Indonesia’s renewable energy mix.

He highlighted plans for additional projects, including the Floating Solar Power Plants (PLTS) Saguling (60 MW), PLTS Karangkates (100 MW), and PLTS Singkarak (50 MW) expected to be operational by 2026.

“Moving forward, PLN will accelerate the development of all listed renewable energy projects outlined in the 2021–2030 Electricity Supply Business Plan (RUPTL),” Darmawan said.

PLN aims to achieve 20.9 gigawatts (GW) of renewable energy capacity by 2030, encompassing hydro, solar, wind, biomass, geothermal, and other sources.

As of April 2024, PLN has processed 17.5 GW of renewable-based power generation, with 5 GW in funding stages, 7.8 GW in procurement, 3.46 GW under construction, and 1.1 GW already operational, while 3.6 GW is in planning.

Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

State-owned mining company PT Antam is planning to build a precious metal factory at the Java Integrated Industrial and Ports Estate (JIIPE) in Gresik, East Java as part of the efforts to support downstreaming of mineral industry in Indonesia, while utilizing integrated infrastructure of the industrial estate.
The Asian Development Bank (ADB) signed a US$92.6 million (Rp1.5 trillion) financing agreement with PT Supreme Energy Muara Laboh (SEML) for the development of Indonesia’s geothermal power resources.
Masdar, a clean energy company from the UAE, has expressed its commitment to increase investment in Indonesia. Abdulaziz said Indonesia would remain a renewable energy hub in the Southeast Asia region, despite having various investments with Indonesia’s neighboring countries.
Coordinating Minister for Infrastructure and Regional Development (Menko IPK), Agus Harimurti Yudhoyono (AHY), has revealed the government’s plan to build a US$50 billion (Rp809.5 trillion) giant sea wall on Java Island to protect the island’s coastline from flooding and land subsidence.
Grinding balls producer PT Elecmetal Longteng Indonesia is building a US$40 million (Rp600 billion) grinding ball production plant in the Batang Integrated Industrial Area (KITB), Central Java.
Indonesia’s state-owned mining holding company, MIND ID, plans to increase the capacity of its smelter grade alumina refinery (SGAR) located in Mempawah, West Kalimantan.