Friday, November 22, 2024

PLN Indonesia Power launches solar panel factory to boost renewable energy capacity

Reading Time: < 1 minute
Julian Isaac

Journalist

Editor

Interview

PLN Indonesia Power (PLN IP), through its joint venture subsidiary PT Trina Mas Agra Indonesia (TMAI), inaugurated on Friday, November 1, 2024 an integrated solar panel factory in Kendal, Central Java, with an initial production capacity of 1 Gigawatt Peak (GWp).

The facility, built in partnership with Trina Solar Co. Ltd and PT Dian Swastatika Sentosa, aims to meet Indonesia’s growing renewable energy needs and reduce dependence on imported components.

CEO of PLN IP, Edwin Nugraha Putra, said the factory is equipped with advanced Tunnel Oxide Passivated Contact (TOPCon) technology, which enhances solar panel efficiency to 23.2 percent, surpassing Indonesia’s current average efficiency rate of 20 percent.

The project marks a significant step in State power utility company PT PLN’s commitment to high-efficiency and reliable renewable energy solutions.

“The factory’s N-type TOPCon technology meets the AAA bankability standard from Bloomberg New Energy Finance (BNEF), reflecting our serious commitment to building a renewable energy industry in Indonesia,” Edwin said.

“This facility will also contribute to job creation and local economic growth, aligning with our goals for sustainable, inclusive economic development,” he added.

The 7-hectare factory, capable of producing panels up to 720 Watt Peak per module, is designed to reduce reliance on imported solar panel components and support the country’s energy independence.

The initial production capacity of 1 GWp is set to expand up to 3 GWp in response to domestic demand.

Vice President of PT Trina Mas Agra Indonesia, Lokita Prasetya, noted the company’s readiness to meet Indonesia’s solar energy needs.

“With strong government and PLN support, we can foster increased domestic market demand, achieving energy security and supporting the local economy,” he said.

The new facility positions Indonesia to lead solar energy production in the region, with locally-produced panels expected to accelerate the country’s renewable energy transition.

Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Seamless steel tube producer PT Rainbow Tubulars Manufacture (RTM), a subsidiary of PT Sunindo Pratama (SUNI), has set the target for the new plant under construction to operate commercially in third quarter of 2025.
Cement and building material company Siam Cement Group (SCG) says it is not interested in producing ammonia and green hydrogen in the near future upon learning form results of the company’s own study that the production cost of the two gases is still too costly.
Krakatau Chandra Energi (KCE), a subsidiary of PT Chandra Asri Pacific (TPIA), has planned to expand into a number of renewable energy projects, through the acquisition of hydropower plants (PLTMH) in Java. This acquisition aims to increase the capacity of the green energy mix in supporting the sustainability of the company’s operations.
The President Prabowo Subianto administration has plans to increase electricity capacity by 103 gigawatts (GW) in 15 years, some 75 GW of which will come from new and renewable energy plants, 5 GW from nuclear power plants, and the rest from gas-powered plants.
State-owned telecommunicatiion company PT Telekomunikasi Indonesia (Telkom) has set an ambitious target to build data centers with a total capacity of 500 megawatts (MW) by 2030 in line with the company’s commitment to environmental sustainability.
Telecommunications company Indosat Ooredoo Hutchison has expressed commitment to establish an AI center in Central Java, with further plans to expand to Jakarta and Jayapura, noting that the company has requested three key areas of support from the Prabowo Subianto administration.