Tuesday, November 19, 2024

Indonesia Kendaraan Terminal sets IDR 35 billion for Capex in 2023

Reading Time: 3 minutes
Julian Isaac

Journalist

yan

Editor

Interview

Vehicle transportation company PT Indonesia Kendaraan Terminal Tbk (IPCC) has allocated capital expenditure (Capex) for 2023 of between IDR 35 and IDR 40 billion for maintaining infrastructure and the supra structure of its operations.

The IPCC operates in Tanjung Priok Port in the field of vehicle terminal sector. Its services include cargodoring, stevedoring, receiving & delivery, vehicle processing center (VPC), and equipment processing center (EPC). The company is a subsidiary of state-owned port operators PT Pelabuhan Indonesia II.

PT Pelabuhan Indonesia II (Persero), commonly called Pelindo II, was established in 1991. It is a port managing company in 10 provinces in Indonesia, namely West Sumatra, Jambi, South Sumatra, Bengkulu, Lampung, Bangka Belitung, Banten, Jakarta, West Java and West Kalimantan. 

Capex for operational maintenance 

The IPCC would use most of its Capex to repair and develop infrastructures and supra structures to accelerate its operational activities in the field and the system, said Director of Finance and Human Resources Sumarno.

The main goal of the Capex allocation is to ensure the company’s operational activity runs smoothly as it will affect the system and facilitates customers’ ease of access.

This will also support the company’s future expansion to other potential ports in cooperation with ferry shipping or vehicle terminal.

IPCC Director of Operations and Technicals, Andi Hamdani, said that in the future the company would focus on the human resources sector in pursuing the increase of standards in service competency. It will still maintain good services in its current ports such as the Panjang terminal in Lampung; RoRo (roll-on/roll-off ship) terminal in Belawan, Medan; Dwikora terminal in Pontianak; RoRo terminal in Makassar; and a vehicle terminal in Tanjung Priok, and Gresik terminal.

The company will also support the expansion by implementing and developing a terminal operating system (TOS) and monitoring terminal system (MTS) in all satellite ports. It will also implement an integration monitoring terminal system (ITMS) on the operational integration system and continue the transformation program to other satellite terminals.

All of these efforts would continue to increase the company’s performance this year, said Hamdani.

Risk in the port sector

According to a 2019 analysis from Tedy Herdian, the Deputy Port Facility Security Officer, as a maritime country with a water area reaching 3,257,483 square kilometers or 62.89% of its territory, Indonesia needs connectivity because it is geographically located in waters.

Such connectivity, such as the availability of ports, is important because the number of islands in Indonesia reaches 17,508. The ports connectivity supports the stability of the Indonesian economy evenly. However, as a maritime country with many islands, Indonesia has problems in port activities such as:

  • Waiting time. The waiting time is the process of loading and unloading containers from the ship to the port until it exits the terminal. “However, the smaller the waiting time for loading and unloading at the port, the better the performance, whereas if the waiting time is greater, it will have an impact on the performance of the terminal/port,” Herdian said in his study.
  • Demurrage, or the time limit for the use of containers at the port. The demurrage is calculated through the loading and unloading process from the ship and/or from the port door;
  • Port activity supporting equipment, loading and unloading equipment to support activities at the port. These problems often occur because of lack of equipment due to delays in unloading activities at the port. Vessel delays at the port affect the rental price and have an impact on the selling price of the goods offered. The equipment includes cranes and forklifts. Problems with these facilities still occur, such as at the Nusantara port of Waingapu in East Nusa Tenggara (NTT);
  • Human Resources (HR), increased loading and unloading and trading activities correlate with the quality of port services to make them more effective and efficient. These efforts depend on the availability of human resources.
Julian Isaac

Journalist

yan

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

The President Prabowo Subianto administration has plans to increase electricity capacity by 103 gigawatts (GW) in 15 years, some 75 GW of which will come from new and renewable energy plants, 5 GW from nuclear power plants, and the rest from gas-powered plants.
State-owned telecommunicatiion company PT Telekomunikasi Indonesia (Telkom) has set an ambitious target to build data centers with a total capacity of 500 megawatts (MW) by 2030 in line with the company’s commitment to environmental sustainability.
Telecommunications company Indosat Ooredoo Hutchison has expressed commitment to establish an AI center in Central Java, with further plans to expand to Jakarta and Jayapura, noting that the company has requested three key areas of support from the Prabowo Subianto administration.
Pertamina New and Renewable Energy (Pertamina NRE), in collaboration with PT Sinergi Gula Nusantara (SGN), plans to construct a bioethanol plant in Banyuwangi, East Java, with an annual production capacity of 30,000 kiloliters.
Minister of Energy and Mineral Resources (ESDM), Bahlil Lahadalia, has hinted at the possibility of securing a new investor for the Tuban Grass Root Refinery (GRR) project if Russia’s Rosneft Oil Co PJSC fails to provide clarity on its commitment to the venture, as it faced setbacks due to geopolitical issues.
The Ministry of ESDM has announced plan to establish LPG production plant using local propane and butane resources. With production capacity could range from 1.5 to 2 million tons annually, to address the country’s high LPG demand, which far exceeds its domestic production capabilities.