Friday, December 27, 2024

Revised regulation on rooftop solar power plants issued, quota system imposed

Reading Time: 2 minutes
Audina Nur

Journalist

Editor

Interview

Minister of Energy and Mineral Resources (ESDM), Arifin Tasrif, has issued a revised regulation regarding the utilization of rooftop solar power plants.

The policy is outlined in Ministerial Regulation No. 2/2024 concerning Rooftop Solar Power Plants connected to the Electricity Grid of Business Permit Holders for Public Interest (IUPTLU), which was signed by Arifin on January 29, 2024.

Article 7 (1) of the regulation mandates that IUPTLU holders must establish quotas for the development of rooftop solar power systems for each electricity grid system. The development quota must consider the direction of national energy policies, electricity supply business plans (RUPTL), and the reliability of the electricity grid system as per the grid code regulations of IUPTLU holders.

The development quota for rooftop solar power systems is structured for a period of 5 years, detailed for each year from January to December. “Proposals for the development quota of rooftop solar power systems for the years 2024 to 2028 must be submitted no later than 3 months after the issuance of this Ministerial Regulation,” as stipulated in Article 8 paragraph 4, of the ministerial regulation, which was made avaiable on Thursday, February 22, 2024.

Meanwhile, proposals for the development quota of rooftop solar power systems for the following years must be submitted no later than October preceding the current year. Subsequently, the Director-General of Electricity will evaluate the proposed development quota of rooftop solar power systems involving the Director-General of New and Renewable Energy and Energy Conservation (EBTKE) and may involve relevant ministries or institutions.

“Based on the determination of the development quota for rooftop solar power systems as referred to, IUPTLU holders will establish quotas for the development of rooftop solar power systems based on clustering,” Article 9 paragraph 3 stated.

Clustering refers to the electricity grid system at the customer service unit of IUPTLU holders. On the other hand, surplus electricity from rooftop solar power systems entering the IUPTLU holder’s grid network will not be considered in determining the electricity bill amount for rooftop solar power plant customers. “In terms of electricity tariff payments, prospective rooftop solar power plant customers will use a prepaid mechanism,” the regulation states.

Previously, the Director of Various New Renewable Energy at the ESDM, Andriah Feby Misna, stated that the ministry decided to abolish regulations regarding electricity export schemes intended to reduce electricity bills for consumers installing rooftop solar power systems. This maneuver is aimed at managing the financial burden of state-owned electricity companies amid the widespread oversupply of electricity currently.

“The installed capacity will be used for the consumer itself, so it is expected that consumers will install according to their needs. Later it will be adjusted with quotas, PLN will issue the quotas,” Feby said earlier this month.

Audina Nur

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
No topics
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

PT Supreme Energy Muara Laboh (SEML), a joint company between PT Supreme Energy Sumatera, Sumitomo Corporation and Inpex Geothermal Ltd, signed an amandement of power purchase agreement (PPA) with State power utility PT PLN on December 23, 2024 to develop units 2 and 3 (140 MW) of Muara Laboh geothermal located in South Solok regency, West Sumatra province.
The Morowali Industrial Workers Union (SPIM) is protesting the decision of the management of PT Indonesia Tsingshan Stainless Steel (ITSS), a metal mineral processing and stainless steel production company located within the Morowali Industrial Park in Morowali, Southeast Sulawesi, to dismiss its worker for minor negligence while on duty.
The Ministry of State Secretariat has issued a new policy to improve the efficiency of overseas travel for government officials, which is formalized in a letter signed by Minister of State Secretary Prasetyo Hadi.
Minister of Marine Affairs and Fisheries Sakti Wahyu Trenggono expressed his concern about the condition of research in Indonesia, especially in the marine and fisheries sector.
Minister of Law, Supratman Andi Agtas, says that the government is considering to provide the opportunity for corruptors to secure pardon through a peace fine mechanism, a follow-up to previous President Prabowo Subianto’s statement that the government could grant pardon to corruptors.
The Indonesian Central Bank (BI) announces a strategic step to stabilize the rupiah exchange rate next year, primarily by purchasing Government Bonds (SBN) from the secondary market.