Monday, November 25, 2024

ESDM ministry collaborates with foreign companies on wind energy potential in Java

Reading Time: 2 minutes
Julian Isaac

Journalist

Editor

Interview

The Ministry of Energy and Mineral Resources (ESDM) has teamed up with foreign companies to explore the wind energy potential in Java, assessing the feasibility of building Wind Power Plants (PTBs) in the region.

“Wind potential assessments have already been conducted with foreign companies,” ESDM Minister Arifin Tasrif said on Thursday, August 8, 2024.

The foreign companies utilize satellite technology to identify potential wind movement hotspots along the coast of Java.

In addition to assessing wind potential, this effort also aims to determine the economic viability of developing PLTBs.

Eniya Listiani Dewi, Director General of New, Renewable Energy and Energy Conservation (EBTKE) at the Ministry of ESDM, previously mentioned that Indonesia has a significant wind energy potential of up to 155 gigawatts (GW), but only about 0.1 percent of this potential has been tapped into so far.

“Our wind energy potential is massive. We hope to see the development of both onshore and offshore wind turbines,” Eniya said during the Katadata Sustainability Action For The Future Economy (SAFE) 2024 event in Jakarta on Thursday, August 8, 2024.

The potential for wind power in Indonesia is spread across several regions, including South Kalimantan, South Sulawesi, and Java, particularly in East Java and the southern Java Sea area.

According to a report from the Ministry of ESDM, the installed capacity of renewable energy power plants in Indonesia reached 13,155 megawatts (MW) in 2023. The largest capacity comes from hydropower, totaling 6.784,2 MW, or approximately 51.6 percent of the total installed capacity of renewable energy power plants nationwide.

Below is the complete list of installed capacities of renewable energy power plants in 2023, categorized by energy source:

  • Hydropower plants: 6,784.2 MW
  • Bioenergy power plants: 3,195.4 MW
  • Geothermal power plants: 2,417.7 MW
  • Solar power plants: 573.8 MW
  • Wind power plants: 154.3 MW
  • Coal gas power plants: 30 MW
Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Seamless steel tube producer PT Rainbow Tubulars Manufacture (RTM), a subsidiary of PT Sunindo Pratama (SUNI), has set the target for the new plant under construction to operate commercially in third quarter of 2025.
Cement and building material company Siam Cement Group (SCG) says it is not interested in producing ammonia and green hydrogen in the near future upon learning form results of the company’s own study that the production cost of the two gases is still too costly.
Krakatau Chandra Energi (KCE), a subsidiary of PT Chandra Asri Pacific (TPIA), has planned to expand into a number of renewable energy projects, through the acquisition of hydropower plants (PLTMH) in Java. This acquisition aims to increase the capacity of the green energy mix in supporting the sustainability of the company’s operations.
The President Prabowo Subianto administration has plans to increase electricity capacity by 103 gigawatts (GW) in 15 years, some 75 GW of which will come from new and renewable energy plants, 5 GW from nuclear power plants, and the rest from gas-powered plants.
State-owned telecommunicatiion company PT Telekomunikasi Indonesia (Telkom) has set an ambitious target to build data centers with a total capacity of 500 megawatts (MW) by 2030 in line with the company’s commitment to environmental sustainability.
Telecommunications company Indosat Ooredoo Hutchison has expressed commitment to establish an AI center in Central Java, with further plans to expand to Jakarta and Jayapura, noting that the company has requested three key areas of support from the Prabowo Subianto administration.