Tuesday, November 26, 2024

Pertamina Finalizes Decision on Investment for Masela Block Totaling IDR 535.96 Trillion

Reading Time: 2 minutes
Audina Nur

Journalist

Editor

Interview

Pertamina is looking forward to making the final investment decision (FID) for the LNG Abadi Block Masela project in the Tanimbar Islands, Maluku, in the next one to two years.

Fadjar Djoko Santoso, Pertamina’s VP Corporate Communication, mentioned ongoing discussions with the block’s operator, Inpex Masela Ltd, regarding the follow-up to the approved plan of development (PoD) for the field by Minister of Energy and Mineral Resources Arifin Tasrif on November 28, 2023.

Fadjar confirmed that once the finalization is complete, the FID is expected to be submitted within an estimated one to two years.

Pertamina is set to participate in the investment based on its current participating interest (PI) percentage of 20%. The total estimated investment and operational costs for the LNG Abadi Block Masela project are currently at US$34.74 billion, equivalent to IDR 535.96 trillion (assuming an exchange rate of IDR 15,428 per US dollar).

The development plan’s cost estimate includes investment costs, excluding sunk costs, of US$20.94 billion (including CCS investment of US$1.08 billion), operating costs of US$12.97 billion, and Abandonment and Site Restoration (ASR) costs of US$830 million.

The revised development plan now includes investments in carbon capture storage (CCS) facilities, with the project’s operational target set for 2030 or the next seven years.

Director General of Oil and Gas at the Ministry of Energy and Mineral Resources Tutuka Ariadji stated that Inpex can proceed with the development activities for the Abadi Field according to the PoD.

Specifically, Inpex will conduct the design and engineering (FEED) for OLNG, FPSO, GEP, and SURF in 2024, site preparation in 2025, and drilling preparation in 2026.

The cooperation contract for the Masela Block was signed on November 16, 1998, for a 30-year period and has received a 7-year time compensation and a recent 20-year extension, making the contract for the Abadi gas field end on November 15, 2055.

The current participating interest holders in the Masela Block are Inpex Masela Ltd (65%), PT Pertamina Hulu Energi Masela (20%), and Petronas Masela Sdn. Bhd (15%).

The Masela Block is one of the largest oil and gas prospects in Indonesia, with production estimated to reach 1,600 million cubic feet per day (MMscfd) of gas or equivalent to 9.5 million metric tons per annum (mtpa) and 150 MMscfd of pipeline gas, as well as 35,000 barrels per day (bcpd) of condensate.

The project, initially estimated to cost up to US$19.8 billion, will become Inpex’s second-largest gas management asset after the Ichthys LNG Project in Australia.

The Abadi Masela Block project is expected to cover over 10% of Japan’s annual LNG import needs and contribute to energy supply resilience in Indonesia, Japan, and other Asian countries.

Audina Nur

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Seamless steel tube producer PT Rainbow Tubulars Manufacture (RTM), a subsidiary of PT Sunindo Pratama (SUNI), has set the target for the new plant under construction to operate commercially in third quarter of 2025.
Cement and building material company Siam Cement Group (SCG) says it is not interested in producing ammonia and green hydrogen in the near future upon learning form results of the company’s own study that the production cost of the two gases is still too costly.
Krakatau Chandra Energi (KCE), a subsidiary of PT Chandra Asri Pacific (TPIA), has planned to expand into a number of renewable energy projects, through the acquisition of hydropower plants (PLTMH) in Java. This acquisition aims to increase the capacity of the green energy mix in supporting the sustainability of the company’s operations.
The President Prabowo Subianto administration has plans to increase electricity capacity by 103 gigawatts (GW) in 15 years, some 75 GW of which will come from new and renewable energy plants, 5 GW from nuclear power plants, and the rest from gas-powered plants.
State-owned telecommunicatiion company PT Telekomunikasi Indonesia (Telkom) has set an ambitious target to build data centers with a total capacity of 500 megawatts (MW) by 2030 in line with the company’s commitment to environmental sustainability.
Telecommunications company Indosat Ooredoo Hutchison has expressed commitment to establish an AI center in Central Java, with further plans to expand to Jakarta and Jayapura, noting that the company has requested three key areas of support from the Prabowo Subianto administration.