Tuesday, December 24, 2024

Bersama Digital Infrastructure Asia establishes data center in Indonesia

Reading Time: 2 minutes
Julian Isaac

Journalist

Mahinda Arkyasa

Editor

Interview

Bersama Digital Infrastructure Asia Pte Ltd (BDIA), a Singapore-based joint venture company between Provident, Saratoga and Macquarie Asset Management, announced their plan to establish the Bersama Digital Data Center (BDDC) in Indonesia.

The project is aimed at providing a data center with 60 Megawatts capacity within the span of three to four years. The estimated capital for the project is said to be at US$ 600 million (IDR 8.8 billion).

The BDCC is a data center platform that serves as a center of interconnectivity with an integrated digital ecosystem.

Meanwhile, a data center is a facility that specifically stores data from hundreds to thousands of servers. Having a localized data center in Indonesia will allow digital service providers to improve time and cost efficiency, boost high security, create faster network, reduced downtime, which can translate to lower e-commerce losses, and low latency which can help faster flow of infoermation.

Opportunities in weaknesses

The data center project is intended as a strategic effort by Bersama Digital Infrastructure Asia (BDIA) to expedite the fulfillment of digital infrastructure needs in various Indonesian sectors. Indonesia itself has been experiencing rapid growth of the internet in the last 4 years.

However, lack of data centers is one of the obstacles of developing reliable digital services. In Indonesia, data center penetration rate is recorded at 0.3 Watt (W) per capita in Asia Pacific. This condition provides an opportunity for BDIA to step in and provide assistance.

Muhammad Arif, Chairman of the Association of Indonesian Internet Service Providers (APJII) said that the presence of BDDC will strengthen the data center industry in Indonesia going forward.

“Our hope is that the presence of BDDC will continue to encourage Indonesia’s digitization process to be more efficient and help accelerate national economic growth and be able to have a wider impact on various regions in Indonesia,” said Setyanto Hantoro, President Commissioner of Bersama Digital Data Centers (BDDC).

Julian Isaac

Journalist

Mahinda Arkyasa

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

PT Pertamina Geothermal Energy (PGE), a subsidiary of State energy company PT Pertamina has embarked on the exploration of several locations to discover new clean energy toward Net Zero Emission (NZE) 2060 target.
Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.