Thursday, December 19, 2024

Tsingshan Group to build battery factory in Weda Bay

Reading Time: 2 minutes
Audina Nur

Journalist

Editor

Interview

Tsingshan Holding Group Co.’s business unit, the world’s top nickel producer, plans to build a battery factory in Indonesia as part of China’s latest investment efforts to boost the Southeast Asian country’s economy by downstreaming raw commodities.

As reported by Bloomberg on Wednesday, March 27, 2024, the REPT Battero Energy Co. battery business unit of the Tsingshan Group will be located in the Tsingshan operating area in Weda Bay and is expected to start operating next year. The aim of this construction is to compete with other nickel battery manufacturers who are currently building new factories in other countries.

REPT also intends to take advantage of the raw materials and infrastructure provided by the Tsingshan Group.

Building a factory in Indonesia can also reduce concerns about trade conflicts that threaten exports from China.

“Some battery manufacturers are building production facilities and adding new capacities in Europe and North America, but we estimate that these new capacities will only start operating around 2026 or later,” US REPT General Manager Jason Hong said in an interview.

“We aim to surpass other battery manufacturers by building a factory in Indonesia,” he added.

It is worth noting that China is one of the largest investors in Indonesia with investments exceeding $7 billion last year. The majority of these investments are used to build downstream facilities for abundant raw materials in Indonesia.

The Indonesian government has the ambition to become an electric vehicle hub, a sector where China leads in sales. Indonesia is the world’s largest nickel miner and the second-largest cobalt producer in the world. Both minerals are essential for producing electric vehicle batteries.

REPT has started selling batteries for energy storage systems, which then expanded to car manufacturers, including Stellantis NV, Li Auto Inc, and SAIC Motor Corp.

According to the China Automotive Battery Innovation Alliance, REPT currently ranks 9th in China for electric vehicle battery installations in the first 2 months of 2024, up from 11th position at the end of last year.

Audina Nur

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
No topics
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.