Thursday, December 19, 2024

PLN-Huawei to develop innovation center, boost foundation for energy transition

Reading Time: 2 minutes
Julian Isaac

Journalist

Editor

Interview

State electricity company PT PLN continues to undertake digital-based corporate transformation and development of electricity system technology in line with energy transition measures among others through the development of Joint Innovation Center (JIC) in collaboration with PT Huawei Tech Investment.

PLN President Director Darmawan Prasodjo praises the progress and innovation made by JIC in responding to the digitization needs of PLN since its inauguration in November 2023, calling the cooperation as a milestone in how the global community unites to fight the climate change crisis.

“The JIC is intended to map every technical, strategic, operational and investment challenge. In this way, every challenge can be overcome, can be mitigated, and can be managed so that we can move forward and achieve the mission of energy transition,” Darmawan said on Thursday, April 25, 2024.

He cited that since its establishment five months ago, the JIC has contributed for the success of several pilot projects, including Internet of Things (IoT) technology in the distribution network called Intelligence Distribution Solution (IDS) combined with One Fiber Multi-Services (1FMS). In the future, JIC will also develop smart inspection of transmission networks, digital network operations, and increase human resources who master the latest technology.

Darmawan said further that JIC’s existence will also support the Accelerated Renewable Energy Development (ARED) scheme in order to accelerate the energy transition. Through ARED, PLN builds a reliable electricity system equipped with a smart grid to integrate generation, transmission, distribution and customer service systems.

“With the smart grid, we can harmonise the operation of energy storage systems in the form of batteries as base-load to deal with the challenges of intermittency of new renewable energy (EBT). It also enables the delivery of electricity from renewable sources from very remote locations to the demand center,” Darmawan said.

Meanwhile, Huawei’s Vice President & CEO of Power Digitalization, David Sun, hopes that various achievements of the JIC can be useful for the Indonesian electricity industry, especially PLN.

“One of the technologies that we bring in this collaboration is the development of 1FMS, which we believe will become a world-class benchmark in the future,” David said.

Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.