Thursday, December 19, 2024

Ministry aims for quadrupled production at Inalum

Reading Time: < 1 minute
Audina Nur

Journalist

Editor

Interview

The Ministry of Industry is actively promoting the development of downstream aluminum industries, despite minimal investment interest and production expansion from existing smelters.

According to ministry data, Indonesia currently has only two aluminum smelting industries with a combined input capacity of 1 million tons. However, the ministry aims to achieve a production capacity of 1.5 million to 2 million tons of aluminum by 2025.

Director-General of Metal, Machinery, Transportation Equipment, and Electronics Industry (Ilmate) at the Ministry of Industry, Taufiek Bawazier, emphasized the significant value-added potential from bauxite to alumina to aluminum, warranting increased investment.

Taufiek highlighted the importance of quadrupling the capacity of entities like PT Indonesia Asahan Aluminium (Inalum) to nearly 1 million tons of aluminium per year to meet the demand. This expansion is crucial for embracing renewable energy and catering to aluminium-intensive projects like solar panels, which offer a substantial increase in value-added potential.

Moreover, aluminum plays a vital role in downstream products, particularly in food packaging and other everyday necessities. Taufiek urged support from the Investment Coordinating Board (BKPM) to guide investments comprehensively, ensuring complete downstreaming.

Presently, domestic aluminium smelting industries have a combined input capacity of 1 million tons per year, with 500,000 tons produced by PT Indonesia Asahan Aluminium (Inalum) and the remaining 500,000 tons imported by PT Hua Chin Aluminium Industry.

Inalum plans to increase its production capacity to 2.45 million tons of aluminium by 2030. Meanwhile, PT Hua Chin Aluminium Industry is constructing a smelter with a capacity of 500,000 tons. Additionally, PT Bintan Alumina Indonesia and PT Kalimantan Aluminium Industri are slated to construct aluminium smelters with capacities of 2 million tons each by 2027, pending feasibility studies.

Audina Nur

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
No topics
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.