Sunday, December 22, 2024

Lemigas advances research on carbon capture technologies in Indonesia

Reading Time: 2 minutes
Julian Isaac

Journalist

Editor

Interview

The Oil and Gas Institute (Lemigas) has conducted a series of studies related to the implementation of Carbon Capture Storage (CCS) and Carbon Capture and Utilization Storage (CCUS) technologies in Indonesia.

The research collaboration involves various stakeholders, including Pertamina, Mitsubishi, Shell, Total, Japex, ITB (Bandung Institute of Technology), as well as financing institutions like ADB and the World Bank.

“Lemigas, with its laboratory capabilities and expert team, has conducted various studies related to CCS/CCUS since 2003,” Head of Lemigas, Ariana Soemanto, said on Monday, February 12, 2024.

She emphasized the significance of enhancing the competency of existing human resources to implement CCS and CCUS programs.

Lemigas researcher, Dandan Damayandri, mentioned their active role in educating stakeholders on the developments, regulations, and economics of CCS/CCUS through the Knowledge Sharing Lemigas Academy.

Dandan outlined three main stages in the implementation of CCS/CCUS:

● CO2 capture technology at the source
● CO2 transportation technology from the source to the reservoir
● Injection technology and post-injection CO2 monitoring

He noted that stakeholders’ interest in utilizing emission reduction technologies through CCS and CCUS programs is promising.

This is evident from the activities related to CCS/CCUS in almost all oil and gas areas in Indonesia. The government also provides incentives such as carbon tax and carbon credits.

“Currently, there are 15 CCS/CCUS projects being developed in Indonesia, including Clean Ammonia in Central Sulawesi, Repsol Sakakemang, BP Tangguh, Pertamina Sukowati, Aceh Carbon Center, Exxon Mobile Indonesia Regional Storage Center, and Pertamina Jatibarang,” he said.

In addition to incentives for providing business certainty, the Ministry of Energy and Mineral Resources (ESDM) has issued Ministerial Regulation No.2/2023 to address the implementation of CCS/CCUS activities, covering technical, business scenario, regulatory, and economic aspects.

The legal framework is further strengthened with the enactment of Presidential Regulation No. 14/ 2024 on the Implementation of Carbon Capture and Storage Activities, which includes regulations for CCS activities’ exploration and operation.

Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.