Saturday, December 21, 2024

Pertamina NRE-Huawei collaborate for renewable energy, smart grid development

Reading Time: 2 minutes
Julian Isaac

Journalist

Editor

Interview

Pertamina New and Renewable Energy (Pertamina NRE) has entered into a partnership with Huawei Technologies Co., Ltd for the development of renewable energy and smart grid technologies in Indonesia. The collaboration encompasses innovation and the development of smart grid technology, distributed generation and digitization.

Norman Ginting, Director of Projects and Operations at Pertamina NRE, expressed enthusiasm for the strategic collaboration with Huawei.

“We hope that with Huawei’s experience in renewable energy technology, it can support Pertamina NRE’s aspirations in developing a low-carbon business and energy transition,” Norman said as quoted by Katadata.co.id on Tuesday, January 30, 2024.

Earlier, the memorandum of understanding was signed by Norman Ginting, Director of Projects & Operations at Pertamina NRE, and Jing Song, Head of the Digital Power Business Department at Huawei Tech Investment, on January 11, 2024.

Norman emphasized that the partnership aims to bring breakthroughs in the development of renewable energy projects in Indonesia, strengthening Pertamina NRE’s operations through digitization and smart grid applications.

As part of the collaboration, Pertamina NRE and Huawei will explore and conduct various studies to identify potential joint projects. The partnership will also involve knowledge-sharing and technical studies related to mutually identified projects.

Jing Song expressed enthusiasm for the collaboration, emphasizing that it is expected to benefit the people of Indonesia. The national energy resilience through clean energy will be enhanced through the development of renewable energy and smart grid technologies.

On another note, Fadjar Djoko Santoso, Vice President of Corporate Communication at PT Pertamina, highlighted that Pertamina is actively developing renewable energy to support the Net Zero Emission 2060 target.

He stated, “Collaboration continues with various parties because the development of renewable energy requires collaboration and high technology.”

According to data from the Ministry of Energy and Mineral Resources (ESDM), the share of renewable energy in Indonesia’s primary energy mix was 13.09 percent in 2023, below the target that was set at 17.9 percent.

Julian Isaac

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.