Monday, November 25, 2024

Inpex reveals financial scheme for Masela Block

Reading Time: 2 minutes
Audina Nur

Journalist

Editor

Interview

Inpex Masela Ltd. is planning to utilize a trustee borrowing scheme (TBS) as part of the financing strategy for the Abadi LNG project in the Masela Block, which is aiming for onstream operations by the end of 2029.

Akihiro Watanabe, Managing Executive Officer and Senior Vice President of Asia Projects at INPEX, said that this financing scheme, widely used in Indonesia’s oil and gas industry, is considered robust, despite recent trends of financial institutions reducing their portfolios in the fossil fuel sector.

“This financing scheme has been successful in Indonesia, used in Bontang, Tangguh, and Arun before. We plan to use the same financing scheme, and it is currently in the process,” Watanabe said after the Kick-Off of PMT Abadi Masela LNG Project in Jakarta on Thursday.

This financing scheme, known as a loan mechanism with project yield collateral to mitigate business risks in the domestic oil and gas industry, involves lenders bearing some of the risks.

Additionally, Watanabe expressed optimism about securing a robust loan from financial institutions as the Abadi Masela LNG Project has officially incorporated carbon capture storage (CCS) into its development plan.

“We have heard that financial institutions are comfortable because we have CCS; that’s why CCS is crucial,” he added.

On another note, Watanabe mentioned that Inpex is currently focused on securing gas buyers from the Masela Block. Inpex has gathered interest from both domestic and international buyers, with a total gas requirement of approximately 25 million tons per year (mtpa).

Several buyers have already signed letters of intent (LoI), memoranda of understanding (MoU), and head of agreements (HoA) regarding potential gas purchases from the Abadi Field.

“We believe that gas from Masela will be in high demand in the market,” he stated. Earlier reports from the Ministry of Energy and Mineral Resources revealed that the investment and operational costs for the development of the Abadi LNG Project in the Masela Block amounted to USD 34.74 billion, equivalent to IDR 535.96 trillion.

The estimated development costs include investment costs, excluding sunk costs, of USD 20.94 billion (including CCS investment of USD 1.08 billion), operational costs of USD 12.97 billion, and Abandonment and Site Restoration (ASR) costs of USD 830 million.

This estimate emerged after Minister of Energy and Mineral Resources Arifin Tasrif approved Revision 2 of the First Field Development Plan (POD I) for the Abadi Field WK Masela on November 28, 2023.

“Inpex can carry out the development activities of the Abadi Field according to the POD,” said Tutuka Ariadji, Director-General of Oil and Gas at the Ministry of Energy and Mineral Resources.

Specifically, Inpex will conduct design and engineering (FEED) for OLNG, FPSO, GEP, and SURF in 2024, site preparation in 2025, and drilling preparation in 2026.

The Masela Block cooperation contract was signed on November 16, 1998, for a 30-year period and has received a 7-year time compensation and a recent 20-year extension. Consequently, the contract for the Abadi gas field will expire on November 15, 2055.

The current participating interest holders in the Masela Block are Inpex Masela Ltd (65%), PT Pertamina Hulu Energi Masela (20%), and Petronas Masela Sdn. Bhd (15%).

The Masela Block is one of the largest oil and gas prospects in Indonesia, with expected production reaching 1,600 million cubic feet per day (MMscfd) of gas or 9.5 million mtpa, along with 150 MMscfd of pipeline gas and 35,000 barrels per day (bcpd) of condensate.

Audina Nur

Journalist

 

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
No topics
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

The Mining advocacy network (Jatam) has alleged that a larger part of the President Prabowo Subianto Cabinet has direct and/or indirect link to extractive oligarchy.
The Securities Crowdfunding (SCF) and Initial Public Offering (IPO) schemes are the two main instruments offered by the Indonesian capital market to support corporate funding, a senior official at the Indonesia Stock Exchange (IDX) has said.
Former Minister of Communication and Informatics (Kominfo), Budi Arie Setiadi, has alleged the presence of individuals linked to online gambling within the ministry before his tenure began.
Former Coordinating Minister for Political, Legal, and Security Affairs, Mahfud MD, has expressed concern over what he perceives as political undertones in the arrest of former Trade Minister Thomas Trikasih Lembong, known as Tom Lembong.
The Center of Economics and Law Studies (CELIOS) research institute revealed that the state budget (APBN) deficit has the potential to exceed the safe limit and could reach three percent in 2029 due to the free nutritious meal program (MBG).
The Center for Indonesia’s Strategic Development Initiatives (CISDI) says that the simultaneous Regional Head Elections (Pilkada) on Wednesday, November 27, 2024 can be a momentum to determine leaders who care about the impact of the climate crisis.