Thursday, December 19, 2024

Indonesia’s oil and gas drilling targets threatened by rig shortage, SKK Migas takes action to tackle crisis

Reading Time: 2 minutes
Julian Isaac

Journalist

Mahinda Arkyasa

Editor

Interview

The Indonesian Petroleum Association (IPA) highlighted a number of problems with the scarcity and high rental costs of rigs for upstream oil and gas activities in Indonesia.

Rig shortage threatens oil and gas drilling

Such condition has the potential to threaten the achievement of this year’s drilling target for oil and gas wells. In 2023, the Special Task Force for Oil and Gas (SKK Migas) is targeted to drill 991 wells. However, only 864 wells have been drilled so far.

Meanwhile, to achieve 991 wells target, as many as 150 rigs is required. Out of the total 150 rigs, 111 rigs will be development well rigs and 39 rigs will be exploration well rigs.

However, until April 2023, only 89 development well rigs that are already in the contract process, while as many as 22 exploration well rigs are currently under the procurement process.

Ronald Gunawan Vice President of the IPA explained that there was a shortage of drills in the upstream oil and gas sector because oil and gas manufacturing companies reduced their activities during the Covid-19 pandemic. As a result, rig supply companies store their drill tools in storage.

High rental costs and delays

As the hunt for fossil energy intensifies, demand for oil rigs begin to increase, causing higher demand compared to rig availability, which triggers scarcity.

“Of course, due to global conditions, which have increased activity since last year, the availability of rigs in Indonesia is limited,” said Hudi Suryodipuro, Head of Program and Communication Division of SKK Migas.

Meanwhile, rigs that are stored in storage locations have aged and require additional maintenance costs before they can be utilized again. Such condition incurs extra costs for rejuvenation.

“When drilling starts to get busy, provision of rigs takes time, needs to be ordered again and it doesn’t come in one month, sometimes it can be three to four months. As a result there are supply and demand problems,” said Ronald, on July 20, 2023.

This condition occurs not only in Indonesia but in various upstream oil and gas areas in all parts of the world.

On the other hand, the price of using offshore rig services has increased considerably, especially in Saudi Arabia and the United Arab Emirates.

“Onshore rigs are the same, but the increase is not as high as that of sea rigs because the supply and demand are still okay. The costs are going up but not as bad as offshore rigs,” he said.

Hudi said that the short number of available rig facilities have caused an increase in rental fee, especially for offshore drilling rig activities.

Currently, SKK Migas is taking a number of steps to address the shortage of rigs, such as exploring opportunities for joint procurement with contractors to optimizing the use of rigs by changing the strategy for operational and drilling implementation.

Julian Isaac

Journalist

Mahinda Arkyasa

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

Inter-island electricity connections through transmission are urgently needed to supply energy, with the government striving to maximize the potential of solar power to hydro power. As of now, Indonesia needs US$20 billion (Rp321 trillion) to build a transmission line connecting the islands.
PT Kilang Pertamian Internasional (KPI) is collaborating with PT Gapura Mas Lestari (GML), a used cooking oil exporting company, to meet the raw material needs in the production of bioavtur or sustainable aviation fuel (SAF).
PT Daikin Industries Indonesia (DIID), a part of the global Daikin network, has completed the construction of its new air conditioner (AC) manufacturing plant at the Greenland International Industrial Center (GIIC) in Cikarang, West Java on Thursday, December 12, 2024.
The Institute for Essential Services Reform (IESR) is optimistic that President Prabowo Subianto administration’s target of completely shutting down all coal-fired power plants (PLTU) by 2040 is attainable.
State power utility PT PLN has announced that its floating solar power plant (PLTS) in collaboration with HK based GD Power at the Karangkates Reservoir in East Java will commence operations by 2026.
The Ministry of Energy and Mineral Resources (ESDM) has confirmed that the draft National Electricity General Plan (RUKN) for 2024–2060 is aligned with the government’s ambitious economic growth target of 8 percent.