Sunday, April 28, 2024

Kayan Hydro Energy, Japan’s Sumitomo partner on 9,000MW plant in North Kalimantan

Reading Time: 2 minutes
Gusty da Costa

Journalist

yan

Editor

Interview

The Kayan hydropower plant developer, PT Kayan Hydro Energy (KHE), has secured a cooperation with Japanese Sumitomo Corp. to develop a 9,000MW (megaWatts) hydropower plant, the largest in Southeast Asia.

“Sumitomo has indeed become a partner, but I will explain the details later,” Kayan’s Operational Director Khaeroni said in Tanjung Selor, North Kalimantan, on August 27, 2022. The hydropower plant project will need an investment of US$17 billion.

The hydropower plant will be integrated with the Industrial Estate and Port Tanah Kuning-Mangkupadi. PT Indonesia Strategis Industri (ISI) is the company that manages the industrial estate and PT Pelabuhan Internasional Indonesia (PII) is the company in charge of developing the international port that supports the industrial estate.  

Development progress

Currently, Khaeroni said the company was engaged in infrastructure development, including road construction to the Kayan 1 dam, which is 12 kilometers away.

“PT Kayan Hydro Energy has been operating continuously for 11 years. We do everything from surveying the location and designing to applying for tens of permits. If you asked the progress on the road construction, it has reached 30% until now,” he explained.

KHE developed the Kayan Cascade hydropower plant by using an area along the Kayan riverbank which has five dams, each of which includes five to six units of power plant turbines. Kayan Cascade hydropower plant has a first phase capacity of 900 MW, a second phase capacity of 1,200 MW, a third and fourth phase capacity of 1,800 MW each and a fifth phase capacity of 3,300 MW. 

The company engages local contractors and workers as part of the project. People living in the area surrounding the project will benefit from the involvement of neighborhood people. “To develop the projects, we intentionally use local contractors and labor, as it is paramount that they benefit from them, and not other people from other regions,” Khaeroni said. 

Industrial estates

KHE will provide electricity to an Integrated Green Economic Zone developed by sister company PT Indonesia Strategis Industri and an international seaport constructed by sister company PT Pelabuhan Internasional Indonesia.  

KHE Chief Executive Officer Andrew Suryali said the integrated green economic zone already had seven companies as tenants. Most of the companies are in the supply chain for electric vehicles, such as PT Alum Ina Indonesia, which manufactures aluminum metal. The company intends to develop and operate an aluminum smelter in the area. 

As part of its partnership with Shandong Xinhua Technology Co., PT Nickel Industri Indonesia plans to develop ferronickel smelters using Rotary Kin Electric Furnace (RKEF) with six production lines or 7 million tons per year within the integrated green economic zones. 

A second company is PT General Battery Indonesia. In addition to producing high-capacity rechargeable batteries, the company will also develop power reserves and electric vehicles, which are essential components of the high technology industry worldwide. 

“PT Indonesia Emobil Industri will develop electric vehicles, including electric cars and buses, using all of these products,” said Suryali.

Gusty da Costa

Journalist

yan

Editor

 

Interview

SUBSCRIBE NOW
We will provide you with an invoice for your reimbursable expenses.

Free

New to Indonesian market? Read our free articles before subscribing to the premium plan. If you already run your business in Indonesia, make sure to subscribe to the premium subscription so you won’t miss any intelligence & business opportunities.

Premium

$550 USD/Year

or

$45 USD/Month

Cancelation: you can cancel your subscription at any time, by sending us an email inquiry@ibp-media.com

Add keywords to your market watch and receive notification:
Schedule a free consultation with us:

We’ll contact you for confirmation.

FURTHER READING

The Ministry of Energy and Mineral Resources (ESDM) estimates that a minimum stock of crude palm oil (CPO) of around 17.57 million kiloliters will be needed to support the Biodiesel B40 program.
PT Hutama Karya (HK) reveals that they have absorbed 76 percent of the total State Capital Injection (PMN) amounting to Rp112.5 trillion (US$6.9 billion) injected from 2015 until 2023.
The Indonesian Association of Geologists (IAGI) has identified the Madura Strait oil field, also known as the Madura Straits PSC, as still prospective for further exploration.
Speculations are rife whether outgoing President Joko “Jokowi” Widodo, who is also the father of Gibran, will exert influence on the running of the new government.
The Ministry of Environment and Forestry (KLHK) ensures that water quality monitoring in the country has extensive coverage with 15,065 monitoring points spread out. The monitoring system becomes one of the discussion topics at the 10th World Water Forum held on May 18-25, 2024, in Bali.
President Joko “Jokowi” Widodo, accompanied by Minister of Public Works and Housing (PUPR), Basuki Hadimuljono, reviewed the progress of the national strategic project (PSN) Bolango Ulu Dam in Bone Bolango Regency, Gorontalo on Monday, April 22, 2024.